Hadfield Dental Care

Project details

Location:
Hadfield

Project:
Conversion of three residential properties into a dental surgery

Duration:
28 weeks

BPG Scope of Works:

  • Electrical installation throughout
  • Mechanical services
  • HVAC installation
  • Medical pipelines
  • Data cable installations
  • Construction of two extensions
  • Re-roofing
  • New glazed façade
  • Windows and doors
  • New bespoke DDA compliant reception
  • Full installation and commissioning of surgery equipment
  • Decoration
  • Flooring

"Building Projects Group has a 'can-do approach' and are constantly looking at ways to improve and help at every stage of a development. They were professional in all aspects of their work and as flexible as possible throughout."

Joanne Bate

Director, Hadfield Dental Care

The challenge

Hadfield dental practice had outgrown its existing premises and had secured three residential properties to convert into a bigger practice. The challenge was to take three old stone terraced properties and convert them into a state-of-the-art dental practice within a small time frame.

The solution

With just 28 weeks to complete this major conversion project, Building Projects Group was quick to establish clear and thorough plans. Following strict guidelines, the high-specification work was completed in good time. Beyond the dental surgeries - which required compliant equipment and HVAC - we also made sure the reception area was smart and patient-friendly.

The benefits

The client was delighted with the finished project and the high standard of workmanship that was apparent throughout. Time was critical for this project to ensure the dental practice could move from its existing cramped building into this purpose-built practice. Five state-of-the-art dental surgeries have been created with a practical, ergonomic, yet aesthetically pleasing design. The project was completed on time and the dental practice has been able to expand and flourish as planned.