BPG carry out full refurbishment and structural repairs to Cheshire school
Removal of existing concrete floors to classrooms that had been painted on the underside of slab with an asbestos substance and was no longer structurally adequate. All the existing gas/ heating & water pipework need to be diverted under the floors while also keep the school operational.